A rapid-deployment, high-thermal modular infrastructure spanning 45,000 square meters, engineered for extreme desert resilience.
Total Area
45,000 sqm
Build Time
90 Days
Series Used
Detachable V4
Establishing a massive logistics footprint within a 90-day window amidst daytime temperatures exceeding 50°C and frequent sandstorm cycles. Conventional construction was ruled impossible due to remote location and timeline constraints.
JIRONGLIAN deployed its proprietary Detachable Series units featuring reinforced thermal insulation cores and seismic-rated structural steel frames. We utilized a phased assembly line on-site, allowing for the simultaneous foundation prep and modular stacking, effectively cutting delivery time by 60%.
Insulation
R-40 Thermal Core
Resistance
180km/h Wind Load
Class 8 seismic resistance ensured through floating foundation modules and high-tensile steel joints.
U-value of 0.22 W/m²K, reducing HVAC energy consumption by 45% compared to standard modular units.
Triple-layer powder coating with salt-spray resistance, essential for desert environments.
95% of components are fully recyclable or reusable in future project reconfigurations.
Request a technical consultation or a similar modular blueprint for your next large-scale infrastructure project.